Aidoo, I, Fugar, F, Adinyira, E and Ansah, N B (2023) Assessing the level of resilience in construction safety management systems in the Ghanaian construction industry. Journal of Construction in Developing Countries, 28(2), 217-42.

Aminorlah, A I, Rahim, N A, Mohamed, Z and Mazlan, A N (2023) Critical delay factors in typical physical projects: The case of the ministry of home affairs in Malaysia. Journal of Construction in Developing Countries, 28(2), 57-79.

Amoah, A, Berbegal-Mirabent, J and Marimon, F (2023) National cultural dimensions and their impact on construction project management in developing countries: The case of Ghana. Journal of Construction in Developing Countries, 28(2), 163-87.

Asiedu, E M and Mkansi, M (2023) Critical factors contributing to budget overruns in ghana’s telecommunication industry construction projects. Journal of Construction in Developing Countries, 28(2), 265-93.

Awodele, I A, Mewomo, M C and Eze, E C (2023) Inhibitors to the adoption of building information modelling in modular construction: A case study of the Nigerian construction industry. Journal of Construction in Developing Countries, 28(2), 19-36.

Dosumu, O S, Mahame, C, Niyitegeka, S and Hahiirwuwambaza, J A (2023) Applications and challenges of adopting the internet of things (IoT) in the Rwandan construction industry. Journal of Construction in Developing Countries, 28(2), 81-100.

Jibrin, I M and Aminu, S M (2023) Information technology as catalyst for value re-engineering implementation in the Nigerian construction industry. Journal of Construction in Developing Countries, 28(2), 189-216.

Moyo, T and Chigara, B (2023) Factors affecting the competence of quantity surveying professionals in Zimbabwe. Journal of Construction in Developing Countries, 28(2), 1-17.

Ojo, A E, Ammasoma, D and Adelakun, J O (2023) Responsiveness of the construction sector to fiscal policy in Nigeria. Journal of Construction in Developing Countries, 28(2), 121-37.

Okoro, C, Nnaji, C, Chileshe, N and Tembo, J (2023) Perceptions of public-private partnerships transportation project success factors in developing countries: An explanatory sequential investigation. Journal of Construction in Developing Countries, 28(2), 295-327.

Omar, M R, Ayob, A, Zakaria, M H, Rahim, N S A, Mokhtar, H, Rani, H A and Rahman, F A (2023) Perspective of construction building professionals on low-carbon materials in Malaysia. Journal of Construction in Developing Countries, 28(2), 139-62.

Saqib, G, Hassan, M U and Zubair, M U (2023) Barriers to incident reporting in the pakistani construction industry: An exploratory factor analysis approach. Journal of Construction in Developing Countries, 28(2), 243-64.

Sierra, F and Rodboonpha, C (2023) Building information modelling implementation models in Thailand: Drivers, benefits, barriers and lessons learned. Journal of Construction in Developing Countries, 28(2), 37-55.

Tehami, M and Seddiki, M (2023) Investigation toward the adoption of building information modelling in Algeria from architects’ perspective. Journal of Construction in Developing Countries, 28(2), 329-52.

Wibowo, A and Hartiati, D (2023) Value-for-money drivers in public-private partnerships in affordable housing in Indonesia: An analytic network process perspective. Journal of Construction in Developing Countries, 28(2), 101-19.

  • Type: Journal Article
  • Keywords: affordable housing; analytic network process; public-private partnership; value-for-money; Indonesia; housing
  • ISBN/ISSN:
  • URL: https://doi.org/10.21315/jcdc-07-22-0137
  • Abstract:
    This study aimed to identify the factors expected to drive value-for-money (VfM) when using public-private partnerships (PPPs) for affordable housing in Indonesia. Utilising economy, efficiency and effectiveness as the VfM criteria, the study employed the analytic network process to determine the relative importance of 13 factors compiled from the literature review. The factors were then grouped into five clusters: private sector capacity, transparent and competitive procurement, risk and reward allocation, public sector capacity and the nature of the long-term contract. The data were gathered through a survey of 20 experts with hands-on experience in Indonesia’s PPPs. Effectiveness was identified as the most critical VfM criterion, implying that bringing other VfM aspects into public decisions is indefensible if the outcome, providing low-income customers with suitable housing at rents they can afford, is not achieved. The justified scope and size of the project, clear output-based specifications, quality project planning and preparation and long-term service delivery emerged as the most critical factors enhancing VfM, each with a different focus on a specific VfM criterion based on local weights. At the cluster level, risk and reward allocation ranked the highest. This study also acknowledges several limitations and provides directions for future research.